Skip to content
Trending
Advertisement
Metro

VIDEO: Motorists stranded as pedestrian bridge work disrupts Lagos-Ibadan Expressway

 

Motorists travelling along the Lagos-Ibadan Expressway are experiencing severe gridlock from Asese down to the RCCG Youth Camp area, following the commencement of a five-day traffic diversion for the installation of a pedestrian bridge.

The Ogun State Traffic Compliance and Enforcement Agency announced that the diversion, which began on Wednesday, November 18, 2026, will last until Sunday, November 22, 2026, at Asese, opposite Christ Embassy .

According to the traffic advisory issued by TRACE Public Relations Officer, Cdr. Babatunde Akinbiyi, the diversion affects inbound Lagos-bound traffic, which will be redirected towards the Lagos carriageway at Asese before rejoining its normal route at a designated exit point opposite Christ Embassy .

The exercise is being undertaken by the Federal Ministry of Works in collaboration with CBC Construction Company to facilitate the installation of the pedestrian bridge across the busy highway .

Advertisement

TRACE and the Federal Road Safety Corps have deployed personnel to the affected section to regulate traffic flow, minimise delays and ensure the safety of motorists. The agency urged motorists to approach the construction zone with caution, exercise patience and comply with instructions from officials on duty .

The current gridlock is compounded by the Lagos-Ibadan Expressway’s reputation as one of Nigeria’s most problematic transit corridors.

In November 2026 alone, multiple crashes have disrupted traffic along the route. On November 7, a series of overnight crashes on the Kara Bridge section caused severe congestion stretching from Kara to Otedola Bridge and beyond, leaving thousands of motorists stranded during the Friday morning rush . Earlier in the month, a container-laden truck overturned on Otedola Bridge, causing major gridlock .

The Otedola Bridge axis has been a persistent flashpoint. In October 2026, the Lagos State Government attributed recurring accidents on the bridge to reckless driving, speeding, overloaded trucks and vehicles in poor condition, after structural assessments found no engineering defects . The Federal Government has also considered reintroducing weighbridges on the expressway to check overloading and reduce accidents .

Advertisement

The diversion is expected to last through the weekend, with the pedestrian bridge installation scheduled for completion by Sunday, November 22. Motorists are advised to plan their journeys with extra time, use alternative routes where possible, and cooperate with traffic management officials.

The agencies have assured that personnel will be on ground to manage the situation and respond to emergencies.

 

Share
Keep reading

More gist like this

All Metro